Laufer, A and Tucker, R L (1988) Competence and timing dilemma in construction planning. Construction Management and Economics, 6(04), 339-55.

Ndekugri, I E and McCaffer, R (1988) Management information flow in construction companies. Construction Management and Economics, 6(04), 273-94.

Pain, J and Bennett, J (1988) JCT with contractor's design form of contract: a study in use. Construction Management and Economics, 6(04), 307-37.

Runeson, G (1988) An analysis of the accuracy of estimating and the distribution of tenders. Construction Management and Economics, 6(04), 357-70.

Shtub, A (1988) The integration of CPM and material management in project management. Construction Management and Economics, 6(04), 261-72.

  • Type: Journal Article
  • Keywords: materials management; project management
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446198800000023
  • Abstract:

    The problem of scheduling a project for which expensive, long-lead inventory items have to be ordered form outside vendors is addressed. A logic aimed at minimizing the cost of such projects is presented along either an illustrated example. The logic is based on adding a material management module to the CPM analysis, evaluating the feasibility of the CPM schedule, and rescheduling the project in case long-lead items make the schedule generated by CPM infeasible. An attempt to integrate CPM and material management in a large-scale construction project is reported and possible extensions of this research are suggested.

Touran, A and Taher, K A H (1988) Optimum fleet size determination by queuing and simulation. Construction Management and Economics, 6(04), 295-306.